Optimizing chilled-water plants’ annual electrical usage requires analyzing chillers’ water-flow-rate requirements
Editor's note: The following is a continuation and conclusion of the article "Primary/Secondary-Loop vs. Primary-Loop-Only Systems,"1 published in the December 2010 issue of HPAC Engineering.
Click here to download this article as a PDF