Keeping Cool

Three facilities — a warehouse, forge plant, and paint-preparation area — had complaints about excessive heat in working areas. I recommended that air be brought in from outside and distributed 10 ft above the floor in the warehouse and paint-preparation area. Because of the forge plant's excessively high temperatures, 4,000-cfm air was to be supplied at each workstation through outlets located 30 in. above the floor. I also recommended that an evaporative cooler (EC) be installed in each facility's supply system.

Article Tools

The dry-bulb (DB) temperature of the air leaving an EC is determined by the wet-bulb (WB) temperature of the surrounding air. If an EC is 100-percent efficient, air leaves the unit at WB temperature. The efficiency of a double-bank EC should be over 90 percent. Because studies have determined that WB temperatures in most cities do not exceed 80°F during summer, a safe assumption is that the WB temperature of outside air would be 78°F when the DB temperature is 90°F. Air that is 90°F is only 6°F below skin temperature, which would not provide adequate cooling to prevent occupant stress. If outside air were passed through a 90-percent-efficient EC first, the DB temperature of the leaving air would be 80°F. If that air — 16°F below skin temperature — were distributed in an occupied space at a velocity of 200 fpm or more, cooling would be adequate.

After the facilities' EC systems were installed, I visited the warehouse on a hot day and did not hear any complaints about the temperature. When I visited the forge plant on an 82°F day, I realized the EC was not running. When I questioned the employees, they said the EC was not turned on until it warmed up outside. I was told they had an agreement with management that if the EC was not operable on a hot day, the employees did not have to work. Nonetheless, since the EC had been installed, production was the same on a hot day as it was during winter; prior to its installation, as much as half of the production was lost on a hot day.

Although I was not able to revisit the paint-preparation area, I received a letter from the manager thanking me for my help. He said the installation I had designed had produced an even better environment than I had indicated.


Acceptable Use Policy
blog comments powered by Disqus

Follow us on

Mike Weil Scott Arnold

HPAC Engineering eNewsletters

Marketplace

Recent Comments

Powered by Disqus
Innovative Solutions

Product Reviews of some of the best new HVACR technology...

Best of 2011!


Here are HPAC Engineering's top articles of 2011.
Click here to see if your favorites made the list!

Back to Top

Browse Back Issues

May 20121

April 2012

March 2012

February 2012

January 2012

December 2011